DID YOU KNOW? DTIC has over 3.5 million final reports on DoD funded research, development, test, and evaluation activities available to our registered users. Click
HERE to register or log in.
Accession Number:
AD0679172
Title:
REPORT OF CYCLOTRON OPERATION, 1 JANUARY - 30 JUNE 1968.
Descriptive Note:
Memorandum rept.
Corporate Author:
NAVAL RESEARCH LAB WASHINGTON D C
Report Date:
1968-10-01
Pagination or Media Count:
30.0
Abstract:
The operation and use of the NRL Sector-Focused Cyclotron is described for the period 1 January - 30 June 1968. During this period the major efforts were in facility start-up. These efforts included beam extraction, transport to experimental stations and initiation of the experimental program. The first extracted beam was obtained on 12 February 1968. On 11 March 1968, a beam was transported through the 9-ft. radius of curvature analyzing magnet. On 27 April 1968, a beam was transported into Experimental Room 2. During May, isotope production was initiated in the cyclotron vault, and preliminary measurements on the Doppler-Shift Attenuation Experiment were started in Room 2. In June, preliminary scattering studies were begun in the 30 inch diameter scattering chamber in Room 3. Author
Distribution Statement:
APPROVED FOR PUBLIC RELEASE