Accession Number:

AD0662190

Title:

PROJECT FAATE, PHASE I, FINAL REPORT.

Descriptive Note:

Corporate Author:

WESTINGHOUSE ELECTRIC CORP COCKEYSVILLE MD PRODUCT SUPPORT AND EQUIPMENT DEPT

Personal Author(s):

Report Date:

1967-10-01

Pagination or Media Count:

170.0

Abstract:

The report consists of three separate parts Part I contains background information and a summary of the overall program Part II presents a detailed account of a controlled experiment that was performed to verify the BFIC concept and Part III exhibits the development of a computer approach used to generate Fault Isolation routines, and the results obtained.

Subject Categories:

  • Manufacturing and Industrial Engineering and Control of Production Systems

Distribution Statement:

APPROVED FOR PUBLIC RELEASE