Accession Number:

AD0658553

Title:

VENTILATION REQUIREMENTS FOR GASPROOFING THE M-5 TANK,

Descriptive Note:

Corporate Author:

ARMY MEDICAL RESEARCH LAB FORT KNOX KY

Report Date:

1942-12-24

Pagination or Media Count:

10.0

Abstract:

The purpose of the report is to determine the capacity of a pressure ventilating system and gas canister required to maintain adequate positive-pressure within the M-5 tank. Author

Subject Categories:

  • Air Conditioning, Heating, Lighting and Ventilating
  • Safety Engineering
  • Combat Vehicles

Distribution Statement:

APPROVED FOR PUBLIC RELEASE