Title:

PRODUCION ENGINEERING MEASURE CRYSTAL UNIT CR-(XM-46A).

Descriptive Note:

Quarterly rept. no. 12, 1 Nov 65-1 Feb 66,

Corporate Author:

LEWIS (E B) CO INC EAST HARTFORD CONN

Personal Author(s):

Report Date:

1966-02-01

Pagination or Media Count:

23.0

Abstract:

The reasons for the failure of the 70 MCs preproduction samples are analyzed. The problems of the instrumentation limitations with particular reference to obtaining satisfactory values of C sub 1 are discussed. The redesign of the 70 MCs units with reference to flatness, plateback and spot size are explained and doumented. The revised manufacturing and testing procedures now possible with the new design are presented. Author

Subject Categories:

  • Electrical and Electronic Equipment
  • Manufacturing and Industrial Engineering and Control of Production Systems