Accession Number:

AD0611218

Title:

PRODUCTION ENGINEERING MEASURE FOR CAPACITORS, FEED-THROUGH, SOLID ELECTROLYTE TANTALUM PELLET.

Descriptive Note:

Quarterly rept. no. 3, 1 Oct-31 Dec 64,

Corporate Author:

FEDERAL PACIFIC ELECTRIC CO NORWOOD MASS CORNELL-DUBILIER ELECTRONICS DIV

Personal Author(s):

Report Date:

1964-12-31

Pagination or Media Count:

33.0

Abstract:

Re-aging of Group II Engineering Samples was completed. Surviving units were submitted to Quality Control for low impedance life test and other required tests. Test data was submitted for all tests. Manufacturing of preproduction samples was initiated during this quarter. Four lots, totaling 650 anode starts, were started. Additional purchase orders were placed for parts to complete the 650 anode starts. At the close of this quarter, three lots were completely assembled 450 anode starts and two lots 300 anode starts were started on aging in accordance with Modification No. 2 of the contract. Minor modifications were made on the anode wire positioning fixture during processing of the preproduction samples. Aging trays and fuse blocks were fabricated for aging of the preproduction samples. The insertion loss test fixture was mounted on an arbor press for increased ease and speed of making insertion loss measurements.

Subject Categories:

Distribution Statement:

APPROVED FOR PUBLIC RELEASE