Accession Number:

AD0609007

Title:

PRODUCTION ENGINEERING MEASURE. CRYSTAL UNIT, TYPE CR-(XM-28)/U.

Descriptive Note:

Final rept. for Jan 59-Jul 64,

Corporate Author:

KEYSTONE CONTROLS CORP NEWARK N J

Personal Author(s):

Report Date:

1964-07-01

Pagination or Media Count:

122.0

Abstract:

The FINAL REPORT presents a condensed summary of all work accomplished on the PEM Contract from January, 1959 to July, 1964. The Summary includes a review of the technical problems encountered and an analysis of test results achieved in the Pilot Run. The report consists of three parts History of the PEM Study, Process Manual and Quality Control Manual. Part I contains detailed descriptions and supporting data on problems encountered in the development of a suitable source of glass holders and sealing equipment, related crystal processing, test results achieved in the Pilot Run, and an analysis of the Aging study. Part II is the Process Manual. Material, equipment, yield figures and operational descriptions are included on all processes employed in the Pilot Run. Part III consists of the Quality Control and Inspection Manual. In format, the Manual has been prepared in accordance with recommended procedures outlined in Part III of SIGSIP No. 3007 SPL dated 1 October 1955. The Manual outlines Quality Control and Inspection Techniques which were applied to the Pilot Run.

Subject Categories:

Distribution Statement:

APPROVED FOR PUBLIC RELEASE