Accession Number:

AD0466849

Title:

PRODUCTION ENGINEERING MEASURE FOR MECHANIZATION OF HIGH RELIABILITY CAPACITORS.

Descriptive Note:

Quarterly rept. no. 9, 30 Dec 64-30 Mar 65,

Corporate Author:

SPRAGUE ELECTRIC CO NORTH ADAMS MA

Report Date:

1965-03-30

Pagination or Media Count:

1.0

Abstract:

Work on the production design engineering and design of pilot line equipment continues. Of the 29 major subassemblies to be used in the mechanized high-reliability capacitor assembly operation, 14 are complete, and another 14 are in various stages of production. The remaining mechanism is being designed. In addition to the progress report, this document also contains a brief description of the assembly sequence and of the function of each subassembly in the mechanized operation. This description incorporates changes and additions made since the description provided in the Fifth Quarterly Report. Author

Subject Categories:

Distribution Statement:

APPROVED FOR PUBLIC RELEASE