Accession Number:

AD0429888

Title:

ELECTRO-INTERFERENCE TEST ON MINUTEMAN FIGURE ' 'A' ' 9164, POWER SUPPLY SET, LAUNCH CONTROL PROTECTIVE SYSTEM,

Descriptive Note:

Corporate Author:

BOEING CO SEATTLE WASH

Personal Author(s):

Report Date:

1962-08-08

Pagination or Media Count:

134.0

Abstract:

The following RFI tests were performed Conducted Generation, transient and steady-state, Radiation Generation, transient and steady-state. Conducted and radiated interference generation was measured and found to be, in most instances, above the limit. Temporary suppression measures were installed upon completion of RFI tests and certain modes were spot checked to determine the effectiveness of the suppression. In modes 1 and 4 the interference level was lowered appreciably, however, modes 2 and 5 showed little improvement. Author

Subject Categories: