Accession Number:

AD0425348

Title:

EVALUATION OF RE-DISTRIBUTION OF LOAD ON LAUNCH FACILITY EMERGENCY BATTERIES.

Descriptive Note:

Field test rept.,

Corporate Author:

BOEING CO SEATTLE WASH

Personal Author(s):

Report Date:

1963-12-16

Pagination or Media Count:

17.0

Abstract:

Presented are the results of tests conducted to evaluate the re-distribution of the loads on Battery Sets numbers 1 2 of the Minuteman launching site. The tests consisted of switching the launch facility over to emergency power, performing one launch sequence and allowing the Batteries to run out with the system at strategic alert. Author

Subject Categories:

Distribution Statement:

APPROVED FOR PUBLIC RELEASE