Accession Number:

AD0423712

Title:

SPECIFICATIONS FOR A TEMPORARY POLAR CAMP

Descriptive Note:

Corporate Author:

NAVAL CIVIL ENGINEERING LAB PORT HUENEME CA

Personal Author(s):

Report Date:

1963-10-23

Pagination or Media Count:

128.0

Abstract:

A temporary polar camp was developed to provide comfortable living conditions for 2- to 5-year occupancy in polar areas. The camp is suitable for use on snow, ice and permafrost as well as firm ground. The design includes structures, air-conditioning, water supply, sanitation, electrical power and other such facilities integrated to form a functional component. A basic camp capacity of 50 men is planned with expansion in 50-man increments to 200-man capacity.

Subject Categories:

  • Military Forces and Organizations

Distribution Statement:

APPROVED FOR PUBLIC RELEASE