Accession Number:
AD0423244
Title:
PRODUCTION ENGINEERING MEASURE FOR MECHANIZATION OF HIGH-RELIABILITY CAPACITORS.
Descriptive Note:
Quarterly rept. no. 2, 31 Mar-30 June 63,
Corporate Author:
SPRAGUE ELECTRIC CO NORTH ADAMS MASS
Personal Author(s):
Report Date:
1963-06-30
Pagination or Media Count:
19.0
Abstract:
Work on production design engineering and design of pilot line equipment continues. The possibility of combining the action of the cold tubulation soldering machine with that of the hot tubulation soldering machine remains under c6nsideration. Author