Accession Number:

AD0422642

Title:

WING II TEST OPERATIONS PLAN (GTM 021).

Descriptive Note:

Corporate Author:

BOEING CO SEATTLE WASH

Personal Author(s):

Report Date:

1963-06-03

Pagination or Media Count:

1.0

Abstract:

This document is the Test Operations Plan by which the SM80B Weapon System is to be tested at VAFB utilizing GTM 021. This Operations Plan includes instructions for testing the SM80B Weapon System. Author

Subject Categories:

Distribution Statement:

APPROVED FOR PUBLIC RELEASE