Accession Number:

AD0416051

Title:

ENGINEERING DEVELOPMENT LABORATORY (EDL) TEST REPORTS, LAUNCH AND COMMUNICATION CONTROL CONSOLE,

Descriptive Note:

Corporate Author:

BOEING CO SEATTLE WASH

Personal Author(s):

Report Date:

1963-02-05

Pagination or Media Count:

1.0

Abstract:

The Launch Control Console was inspected for physical appearances, conformance to engineering drawing and human engineering requirements. The components and subsystems of the console are pedestal structure assembly, top section assem bly, LCC pedestal assembly, missile status launcher indicator, alarm and monitor panel, pro gram control panel, launch control panel, D. C. power filter, alarm control, and audible alarm assembly. Author

Subject Categories:

Distribution Statement:

APPROVED FOR PUBLIC RELEASE