Accession Number:

AD0412717

Title:

ACCEPTANCE SUMMARY REPORT FTM - 425,

Descriptive Note:

Corporate Author:

BOEING CO SEATTLE WASH

Personal Author(s):

Report Date:

1963-03-07

Pagination or Media Count:

1.0

Abstract:

This document contains the following Waivers and Deviations granted by Air Force Ballistic System DivisionSpace Technology Laboratories against the requirements of Model Specifications S-133-1000-0-1 for this missile Certification by Boeing Engineering and Quality Control that the Missile Assembly complies with the require ments of the applicable specification andor top drawing and Certification by Autonetics, Thiokol Chemical Corporation, Aerojet General Corporation and Hercules Powder Company, of compliance with applicable specifications andor top drawing A list of part shortages for the Missile and a list incomplete items traveled to the Launch Area and Identify by Equipment Model andor Drawing Number of the Missile Configuration. Author

Subject Categories:

Distribution Statement:

APPROVED FOR PUBLIC RELEASE