Accession Number:

AD0408426

Title:

DOCK REQUIREMENTS SCHEDULE - STATUS/SHORTAGE. REPORT FOR GFP - VAFB WINGS III - V

Descriptive Note:

Corporate Author:

BOEING CO SEATTLE WA

Personal Author(s):

Report Date:

1963-04-10

Pagination or Media Count:

192.0

Abstract:

This volume specifies the Government Furnished Property GFP required by the Wings III thru V Vandenberg Air Force Base VAFB Test Program Contractor, The Boeing Company, for the Minuteman Program. The scope of this document is to provide identification of items of GFP by certain classifications, Figure A designation andor part number, nomenclature, and configuration. In addition the scope includes provision for schedule of quantities required together with on-site-need dates. The following types of material are listed Aero-Space Ground Equipment, Airborne Equipment, GEEIA, SAC, FCR Installed Items, Time Compliance Technical Orders, Technical Order Items Required for Validation and Verification, and Non-Figure A Items Required for Validation and Verification.

Subject Categories:

  • Surface-Launched Guided Missiles
  • Guided Missile Launching and Basing Support
  • Logistics, Military Facilities and Supplies

Distribution Statement:

APPROVED FOR PUBLIC RELEASE