Accession Number:

AD0405933

Title:

SITE ACCEPTANCE TEST PROCEDURES WHITEMAN AFB

Descriptive Note:

Corporate Author:

BOEING CO SEATTLE WA

Personal Author(s):

Report Date:

1963-05-20

Pagination or Media Count:

55.0

Abstract:

The acceptance tests required are specified for the checkout of equipment assembled into a Minuteman Missile System at Whiteman AFB preparatory to the eventual acceptance of the Flights, Squadrons the entire Wing. Procedure documents required for the certification of Assembly and Checkout ACO test equipment as well as the documents required for checkout of OGE and MGE equipment are called out herein.

Subject Categories:

  • Guided Missile Launching and Basing Support

Distribution Statement:

APPROVED FOR PUBLIC RELEASE