Accession Number:

AD0404766

Title:

ELECTRO-INTERFERENCE TEST REPORT, WS-133A WING I BOEING PACIFIC TEST CENTER - DESTRUCT ORDNANCE INSTALLATION BUILDING

Descriptive Note:

Corporate Author:

BOEING CO SEATTLE WA

Personal Author(s):

Report Date:

1963-01-01

Pagination or Media Count:

36.0

Abstract:

The purpose of this analysis is to show that the ambient electric fields present in the DPIFs are not of sufficient magnitude to cause inadvertent squib firings. Described is the analysis performed per Electro- Interference Test Plan for the WS-133A System Destruct Package Installation Facility, DPIF. Data on Electro-Inter ference levels present in the DPIFs were taken from data sheets, drawings and converted to Electric Field Intensity levels. Broadband voltage levels were converted to equivalent CW levels and the converted broadband CW levels were then compared with the voltage levels calculated necessary to produce 100 milliamperes through a squib. The results show that the fields present in the DPIFs are not of sufficient magnitude to induce 100 milliamperes in the squib circuits. Worst case assumptions are made in all cases.

Subject Categories:

  • Electromagnetic Shielding
  • Guided Missile Launching and Basing Support

Distribution Statement:

APPROVED FOR PUBLIC RELEASE