DID YOU KNOW? DTIC has over 3.5 million final reports on DoD funded research, development, test, and evaluation activities available to our registered users. Click
HERE to register or log in.
Accession Number:
AD0273511
Title:
HUMAN PERFORMANCE AS A FUNCTION OF THE WORK-REST RATIO DURING PROLONGED CONFINEMENT
Descriptive Note:
Technical rept.
Corporate Author:
LOCKHEED AIRCRAFT CORP MARIETTA GA
Report Date:
1961-11-01
Pagination or Media Count:
51.0
Abstract:
The feasibility of using a 4-hours-on and 2 hours-off-duty schedule in the operation of advanced aerospace systems was investigated. Two B-52 combat- ready crews were confined for 15 days in a simulated advanced system crew compartment and were tested with a battery of five performance tasks and four psycho-physiological measures. Data obtained during two 15-day testing periods are summarized. Additional performance data obtained from five studies using college student subjects are presented. These results are based on four 96-hour investigations two with a 4-on and 2-off schedule and two with a 6-on and 2-off schedule and one 120-hour control group study 4 hours per day, 5 days per week, for 6 weeks. With proper control of selection and motivational factors, crews can work effectively for periods of at least two weeks and possibly longer using a 4-on and 2-off work-rest schedule.
Distribution Statement:
APPROVED FOR PUBLIC RELEASE