Accession Number:

AD0260922

Title:

SUPER-POWER KLYSTRON TUBE-TEST FACILITY

Descriptive Note:

Corporate Author:

RADIATION INC PALO ALTO CALIF

Personal Author(s):

Report Date:

1961-03-31

Pagination or Media Count:

1.0

Abstract:

Design and construction efforts were continued on the Klystron test facility. A major effort was made to complete the specification of the interim modulator pulse transformers necessitated by the increase in system capacity. Approval was obtained to include six additional magnet supplies in the system. The required procurements and drawings were produced and the assemblies required for these magnet supplies are in or awaiting active production. Approval was also obtained for the switch tube test supply. This phase of the program received considerable effort so as to construct the power supply within the shortest possible period of time. The construction schedule is being maintained compatible with the projected switch tube test program and final modulator design. The design of the power supply was completed. Author

Subject Categories:

Distribution Statement:

APPROVED FOR PUBLIC RELEASE