Accession Number : ADA607877


Title :   Final Creech Air Force Base Capital Improvements Program Environmental Assessment


Descriptive Note : Final rept.


Corporate Author : AIR COMBAT COMMAND LANGLEY AFB VA


Full Text : https://apps.dtic.mil/dtic/tr/fulltext/u2/a607877.pdf


Report Date : Nov 2013


Pagination or Media Count : 176


Abstract : The Capital Improvements Program (CIP) for Creech Air Force Base (AFB) describes discrete projects, such as major utility upgrades or construction of individual facilities. It also presents planned changes to enhance mission capability and correct space and/or infrastructure deficiencies. At the core of the CIP are lists describing these discrete projects sorted by Military Construction (MILCON) or Operations and Maintenance (O&M). The O&M lists are distinguished by; Restoration and Modernization; Sustainment; and O&M Construction Projects. The latter is a master list containing all O&M projects including those that are not classified as either Restoration and Modernization or Sustainment. The CIP was first identified in the Creech AFB General Plan issued in 2006 and the last CIP was formalized in 2008 (Air Force 2008). However, internally the CIP evolves regularly as completed projects get deleted from the list and as new requirements are identified and planned. Formal updates to the CIP are driven by planned mission changes. A formal CIP update has not been prepared since 2008. The new CIP will incorporate Restoration and Modernization, and Sustainment concepts that are new terms for describing projects that was not used during the previous CIP.


Descriptors :   *ENVIRONMENTAL ASSESSMENT , AIR FORCE FACILITIES , CONSTRUCTION , INFRASTRUCTURE , MILITARY ENGINEERING


Subject Categories : Environmental Health and Safety


Distribution Statement : APPROVED FOR PUBLIC RELEASE