Accession Number : ADA267247


Title :   Final Environmental Planning Technical Report. Geologic Resources


Descriptive Note : Final rept.


Corporate Author : DEPARTMENT OF THE AIR FORCE WASHINGTON DC


Full Text : https://apps.dtic.mil/dtic/tr/fulltext/u2/a267247.pdf


Report Date : Jan 1984


Pagination or Media Count : 152


Abstract : The President has directed that the Air Force deploy the Peacekeeper missile system at a location near F.E. Warren Air Force Base (hereafter F. E. Warren AFB), close to Cheyenne, Wyoming. The peacekeeper system (formerly known as the M-X system) is an advanced, land-based intercontinental ballistic missile with 100 Peacekeeper missiles. Existing missile silos will be used, and there will be very little structural modification needed. Missile replacement will occur within the 319th and 400th Strategic Missile Squadrons, the two squadrons (50 missiles each) located nearest F.E. Warren AFB. Peacekeeper deployment will occur between 1984 and 1989.


Descriptors :   *GEOLOGICAL SURVEYS , *SURFACE TO SURFACE MISSILES , *ENVIRONMENTAL IMPACT STATEMENTS , NATURAL RESOURCES , SOIL DYNAMICS , MINERALS , LAND USE , WATER RESOURCES , SEISMIC DATA


Subject Categories : Geology, Geochemistry and Mineralogy
      Surface-launched Guided Missiles


Distribution Statement : APPROVED FOR PUBLIC RELEASE