Accession Number : ADA256272


Title :   Environmental Assessment: Lockport Approach Dike, Stage 2 Repairs, Will County, Illinois


Corporate Author : ARMY ENGINEER DISTRICT ROCK ISLAND IL


Full Text : https://apps.dtic.mil/dtic/tr/fulltext/u2/a256272.pdf


Report Date : Mar 1992


Pagination or Media Count : 56


Abstract : Fort he past 20 top 30 years, the Lockport approach dike has experienced seepage from the Chicago Sanitary and Ship Canal to the Des Plaines River. Repairs have been made, but a subsidence occurred in May 1990 with two subsequent events, the most recent in November 1990. In the interest of safety and integrity of project operation, the U.S. Army Corps of Engineers is finalizing emergency repairs to stop the subsidence problems. These emergency repairs are considered Stage 1 of a project to raise the safety level of the approach dike. Stage 2 repairs, although not considered to be emergency in nature, are needed to maintain the dike's safety and operation. The dike is experiencing ongoing erosion to its canal side due to canal level fluctuations and tow prop wash at the various water levels.


Descriptors :   *REPAIR , *DIKES , CRACKING(FRACTURING) , SEEPAGE , CIVIL ENGINEERING , ENVIRONMENTAL IMPACT


Subject Categories : Civil Engineering
      Environmental Health and Safety


Distribution Statement : APPROVED FOR PUBLIC RELEASE