Accession Number : ADA252413


Title :   Compliance Testing of Grissom Air Force Base Central Heating Plant Coal- Fired Boilers 3, 4, and 5, Grissom Air Force Base, Indiana


Descriptive Note : Final technical rept. 3-21 Feb 1992


Corporate Author : ARMSTRONG LAB BROOKS AFB TX


Personal Author(s) : Cintron-Ocasio, Ramon A


Full Text : https://apps.dtic.mil/dtic/tr/fulltext/u2/a252413.pdf


Report Date : Jun 1992


Pagination or Media Count : 97


Abstract : A source emission testing for particulate matter and visible emissions was conducted on coal-fired boilers at the Grissom AFB Central Heating Plant during 3-21 February 1992 by the Air Quality Function of Armstrong Laboratory. The survey was conducted to determine compliance with regard to Indiana Administration Code, Title 325 Pollution Control Board, Article 5, Opacity Regulations, and Article 6, Particulate Regulations. All boilers were tested through the bypass stack. Results indicated that boilers 3 and 4 met applicable, visible, and particulate matter emissions standards. Boiler 5 exceeded the particulate standard.


Descriptors :   *CONTROL , *EMISSION , *HEATING , *AIR QUALITY , *AIR POLLUTION , FUNCTIONS , PARTICULATES , POLLUTION , BOILERS , INDIANA , COAL , OPACITY , HEATING PLANTS , REGULATIONS , LABORATORIES , STANDARDS , MANAGEMENT , AIR , QUALITY


Subject Categories : Geology, Geochemistry and Mineralogy
      Air Condition, Heating, Lighting & Ventilating
      Air Pollution and Control


Distribution Statement : APPROVED FOR PUBLIC RELEASE