Abstract : This report recommends construction of the Batavia Reservoir Compound modified alternative to provide flood damge reduction in the Tonawanda Creek Watershed, N.Y. The alternative consists of two shallow detention reservoirs (normally dry) arranged in series. The reservoirs would be formed by construction of two earth dams. Each dam would have principle outlet works comprised of side-by-side conduits; five for the uppder dam and four for the lower, with dimensions of 11 feet by 11 feet. Each conduit would be equipped with an electrically operable gate and provisions for manula operation. The spillways of both dams would be ripraped on the upstream and downstream and crests. The amount of reservoir flood control storage and operation of the selected plan were developed to meet the planning objectives of the study. The degree of protection afforded by the plan is approximately 500-year in the city of Batavia and variable downstream.


Descriptors :   *FLOOD CONTROL , NEW YORK , WILDLIFE , STREAMS , RESERVOIRS , ENVIRONMENTAL IMPACT STATEMENTS


Subject Categories : Civil Engineering