Title :   Engineering Change Orders and their Impact on DoD Acquisition Contracts


Descriptive Note : Technical Report,01 Oct 2015,31 Mar 2017


Corporate Author : Air Force Institute of Technology WPAFB United States


Personal Author(s) : Cordell,Ian S


Full Text : https://apps.dtic.mil/dtic/tr/fulltext/u2/1051568.pdf


Report Date : 23 Mar 2017


Pagination or Media Count : 80


Abstract : Cost growth is a problem DoD wide. Cost Estimators attempt to remedy this problem by accounting for uncertainty in the estimates they complete. They use tools such as Engineering Change Orders (ECOs) to account for the uncertainty, by applying a percentage to the final amount estimated. The following research gives the acquisition community a more precise tool to predict whether a DoD Acquisition Contract will have an Engineering Change Order, which can then be used also during programmatic cost estimating, and also a method for predicting the proper amount of ECO to apply when certain variables are present. The study used both logistic and multiple regression to accomplish this. For both types of regression a stepwise approach was adopted for the response. For the Logistic Regression the Y variable was that an ECO was present and the significant predictor variables were: UAV, 500M (dollars), Navy, Army, Aircraft, Firm Fixed Price (FFP), Cost Plus Fixed Fee (CPFF) and 5M (dollars). The final model was 85 predictive. The multiple regression modeled the expected ECO percent change (less than 100 of baseline). Predictive variables included: 5M, FFP, Munition, Electronics and Missiles, along with a base amount of 22 ECO. This model was more exploratory in nature due to the extreme variability present in ECO percent changes.


Descriptors :   military acquisition , procurement , cost estimates , cost analysis , regression analysis , contracts


Subject Categories : Economics and Cost Analysis
      Logistics, Military Facilities and Supplies