Accession Number : AD0442014


Title :   SPECIAL TEST EVALUATION REPORTS - STP III ECP 51 SYSTEM COMPATIBILITY TEST - ST-114,


Corporate Author : BOEING CO SEATTLE WA


Personal Author(s) : Raulston, D M


Report Date : 29 Jun 1964


Pagination or Media Count : 30


Abstract : Four equipment configurations were tested as follows to evaluate equipment compatibility. The Flatbed Trailer was positioned facing the aft end of the T/E, the ECU was loaded and the ducting was connected between the ACU and the T/E during the first configuration. In the second configuration the aft end of the trailer was positioned to the aft end of the T/E, the ACU was loaded, and the ducting was connected. The Flatbed Trailer was positioned perpendicular to the T/E axis and the ducts connected to the SSCBM ports. The Flatbed Trailer/ACU was connected to the Escort Vehicle pintle hook during the final configuration. The air flow to the T/E was not adversely affected by the ECP 51 hardware and no safety hazards were encountered. (Author)


Descriptors :   HANDLING , CONFIGURATIONS , TRAILERS , FLEXURAL PROPERTIES , LOADS(FORCES) , LOADS(FORCES) , COUPLINGS , SURFACE TO SURFACE MISSILES


Distribution Statement : APPROVED FOR PUBLIC RELEASE