Accession Number : AD0431032


Title :   GROUND SUPPORT SYSTEM SPECIFICATION (TEST OPERATION PLAN) VOLUME I, PART II. MAINTENANCE ANALYSIS SPECIFICATION (TEST OPERATION PLAN),


Corporate Author : HONEYWELL INC ST PETERSBURG FLA


Personal Author(s) : Rohlfs,I G


Report Date : 20 Sep 1961


Pagination or Media Count : 209


Abstract : This Maintenance Analysis Specification (Test Operation Plan), Volume I, Part II of the Dyna Soar (Step I) Program, ''Ground Support System Specification (Test Operation Plan)'', presents the maintenance requirements of the Dyna Soar (Step I) Primary Guidance Subsystem (PGS). The operational support requirements of the PGS are presented in the Operational Ground Support Equipment System Specification (Test Operation Plan) (OGSESS), Volume I, Part I of this document. The maintenance requirements presented are based on the support needs of the Primary Guidance Subsystem (PGS) and the operational support equipment. The elements of the PGS shall include the Inertial Guidance Subsystem (IGS), the Secondary Attitude Reference Subsystem (SARS), and the Guidance Malfunction Detection Subsystem (GMDS). The Primary Guidance Subsystem Associate Contractor (PGSAC) will furnish all the elements of the PGS and the Associated Aerospace Ground Equipment (AGE) (Author)


Descriptors :   *BOOST GLIDE VEHICLES , *GROUND SUPPORT EQUIPMENT , INERTIAL GUIDANCE , SPECIFICATIONS , MAINTENANCE , LOGISTICS , MAINTENANCE EQUIPMENT , MAINTENANCE PERSONNEL , TEST METHODS , CHECKOUT EQUIPMENT , TRANSPORTATION , HANDLING , OPERATION , ACCEPTABILITY


Distribution Statement : APPROVED FOR PUBLIC RELEASE